DL/T 5372-2007 水电水利工程金属结构与机电设备安装安全技术规程

出版时间:2009-9   出版时间:中国电力出版社   作者:中华人民共和国国家发展和改革委员会   页数:208   字数:176000  
封面图片

DL/T 5372-2007 水电水利工程金属结构与机电设备安装安全技术规程
内容概要

  本标准规定了水电水利工程现场金属结构制作、安装及水轮发电机组和电气设备的安装的安全技术要求。  本标准适用于大中型水电水利工程现场金属结构制作、安装和水轮发电机组及电气设备安装工程的安全技术管理、安全防护与安全施工。水型水电水利工程现场金属结构制作、安装和水轮发电机组及电气设备的安装工程可参照执行。
书籍目录

Foreword1
Scope2
Normative
References3
Terms4
General5
General
Provisions6
Fabrication
of
Metal
Structures7
Installation
of
Gates8
Installation
of
Headstock
Gears9
Installation
of
Ship
Lift10
Installation
of
Steel
Pipes
for
Water
Diversion11
Installation
of
Other
Metal
Structures12
Scaffold
and
Platform
for
Construction13
Metallic
Painting
for
Anti-corrosion14
Installation
of
Hydraulic
Turbine15
Installation
of
Generator16
Installation
of
Auxiliary
Equipments17
Installation
of
Electric
Equipments18
Startup
and
Commissioning
of
Hydroelectric
Generating
Unit19
Installation
of
Bridge
Crane20
Construction
Machines
and
Special
Tools
章节摘录

5.
To
operate
the
open-type
automatic
air
breaker,
knife
switchand
tubular
fuse
manually,
insulating
gloves,
insulating
bars
and
otherinsulating
tools
shall
be
used.6.
To
remove
electric
devices,
the
power
supply
shall
be
cut
offfirst
before
exposed
parts
of
conductive
wires
are
well
wrapped,insulated
and
marked.7.
After
installation
of
the
power
supply
system
for
construction,a
complete
system
of
diagrams,
layouts
and
distribution
drawingsshall
be
available.
The
power
supply
system
shall
not
be
put
into
usewithout
inspection
and
acceptance.
Professional
shift
or
team
shallbe
assigned
to
take
charge
of
power
operation
and
maintenance.Other
staff
shall
not
change
the
power
supply
facilities
withoutpermission.8.
The
power
supply
facilities
for
construction
on
site
shall
bemaintained
frequently
and
inspected
once
before
the
rain
seasonevery
year
as
well
as
measured
for
insulation
resistance.9.
To
introduce
power,
monitor
shall
be
provided.10.
Safety
appliances
for
electrician
shall
be
comply
withrequirements
of
relevant
technical
standards
and
checked
regularly.11.
The
power
supply
lines
shall
be
erected
and
laid,
thetransformer
substation
for
construction
shall
be
designed
for
location,structure
and
distribution
and
the
transformer,
accessory
eqm'pmentand
electric
lines
shall
be
installed
and
maintained
in
compliance
withrelevant
regulations
of
DIdT
5370.12.
Electric
equipment
and
facilities
of
127
V
and
above
shall
begrounded
or
zero
terminated.
编辑推荐

《DL/T 5372-2007 水电水利工程金属结构与机电设备安装安全技术规程(英文版)》由中国电力出版社出版。
评论、阅读与下载

DL/T 5372-2007 水电水利工程金属结构与机电设备安装安全技术规程下载



相关评论与评分
 

工业技术分享网 @ 2017